Kuala Lumpur Metro Map 2026 (Rapid KL): MRT & LRT Guide

Last updated: August 20, 2026

Kuala Lumpur Metro Map: Key Facts for Travelers

  • The official integrated plan covers the Rapid KL MRT, LRT and KL Monorail lines together with the main KTM and ERL connections.
  • The Shah Alam Line runs between Bandar Utama and Johan Setia; passenger service began on June 29, 2026.
  • The visitor-focused Rapid Kembara pass costs RM25.00 (≈ USD6.19) for one day or RM55.00 (≈ USD13.61) for three days, excluding the card and minimum stored value.
  • International travelers should not rely on direct bank-card tapping at Rapid KL gates. Tokens and Touch ’n Go cards remain the practical choices, while staffed counters accept debit and credit cards.
  • The KL Monorail opens at 6:00 AM and runs every 7 to 12 minutes depending on the day and time band.
  • Last departures from the terminals fall between 10:50 PM and 11:56 PM, depending on line, day and direction.
  • A separate Express Rail Link (ERL) service reaches KLIA: KLIA Ekspres takes 28 minutes from KL Sentral to Terminal 1 and runs every 20 minutes.

Shah Alam Line service

The Shah Alam Line has carried passengers between Bandar Utama and Johan Setia since June 29, 2026.

Kuala Lumpur Metro Map: Rapid KL MRT and LRT Network

The Rapid KL network combines six MRT and LRT lines with the KL Monorail. The Kelana Jaya Line has carried Klang Valley passengers on fully automated, driverless trains since 1998, making it Malaysia’s first rail system of its kind. The first section entered service on September 1, 1998.

The Kuala Lumpur metro map needs to distinguish lines that operate today from future projects. The Shah Alam Line opened on June 29, 2026, while MRT3 remains an approved orbital project without a published passenger-opening year.

Rapid Rail’s busiest recorded day was May 29, 2024, with 1,004,591 trips across the Kelana Jaya, Ampang and Sri Petaling, Monorail, Kajang and Putrajaya services.

KTM Komuter and the ERL airport services run outside the Rapid KL network and apply their own fares and ticket rules.

The image shows a Rapid KL train waiting at an elevated station in Kuala Lumpur.

KL MRT Map Guide: MRT, LRT and Monorail Lines

  • LRT Kelana Jaya Line, red: Gombak to Putra Heights. This driverless line serves KLCC, Pasar Seni and Masjid Jamek, with weekday peak trains every 3 minutes; MyRapid publishes the service details.
  • LRT Ampang Line, orange: Sentul Timur to Ampang. Its central section shares stations with the Sri Petaling service before the routes separate at Chan Sow Lin.
  • LRT Sri Petaling Line, maroon: Sentul Timur to Putra Heights. It shares the central corridor with the Ampang Line and continues southwest through Bukit Jalil and Puchong.
  • MRT Kajang Line, dark green: Kwasa Damansara to Kajang. Bukit Bintang, Pasar Seni and Muzium Negara are useful visitor stations, and weekday peak waits drop to 4 minutes; MyRapid keeps the line page current.

How to Read the Kuala Lumpur Metro Map

  • Interchange symbols mark the transfer stations; journeys that leave the Rapid KL network fall under the separate KTM Komuter and ERL ticket rules.
  • MRT Putrajaya Line, yellow: Kwasa Damansara to Putrajaya Sentral. TRX is a central interchange, while Putrajaya Sentral connects to the separate KLIA Transit airport service; last departures from Kwasa Damansara run at 11:36 PM from Monday to Saturday, as listed on the timetable page.
  • Shah Alam Line, light blue: Bandar Utama to Johan Setia, 37.8 km, with 20 operating and five provisional stations. Passenger service began at 6:00 AM on June 29, 2026; Bandar Utama connects with Kajang MRT and Glenmarie 2 with Kelana Jaya LRT.
  • KL Monorail, light green: KL Sentral to Titiwangsa, 8.6 km with 11 stations. Bukit Nanas serves KL Tower, and trains run every 7 to 12 minutes depending on the day; MyRapid lists the departure times.

Kuala Lumpur MRT Map Guide for Tourists

The most useful stations for a first visit include KLCC for the Petronas Twin Towers, Bukit Bintang for the central shopping district and Muzium Negara for a pedestrian connection to KL Sentral. The Department of Statistics Malaysia counted 27.0 million domestic visitors in the Federal Territory of Kuala Lumpur in 2024 in its Domestic Tourism Survey, more than any state except Selangor.

KL Sentral is not an MRT station name. The Kajang Line stops at Muzium Negara, and the station information from Mass Rapid Transit Corporation (MRT Corp) identifies the pedestrian connection to the KL Sentral transport hub.

The Petronas Twin Towers and Suria KLCC are served by KLCC station on the Kelana Jaya Line; Suria KLCC’s visitor directions identify station KJ10. Bukit Bintang is on the Kajang Line, and the station details place it in the surrounding shopping and dining district.

Batu Caves requires KTM Komuter and is not an MRT or LRT destination. The official departure information lists the Batu Caves commuter corridor separately.

The image shows a KL Monorail train passing city landmarks on the Rapid KL network.
Attraction or destinationLineStationPractical note
Petronas Twin Towers and Suria KLCCLRT Kelana Jaya LineKLCCKLCC is the rail stop for the city-center complex; on-site signs lead toward Suria KLCC.
Bukit Bintang, Pavilion and Jalan AlorMRT Kajang LineBukit BintangThe station serves the shopping and dining district around Bukit Bintang.
KL SentralMRT Kajang LineMuzium NegaraA pedestrian connection links Muzium Negara station with the KL Sentral transport hub.
Batu CavesKTM KomuterBatu CavesKTM is a separate commuter-rail system with its own timetable and accepted payment media.
Chinatown, Petaling Street and Central MarketLRT Kelana Jaya Line or MRT Kajang LinePasar SeniPetaling Street is about a 3-minute walk from Pasar Seni.
Merdeka SquareLRT Kelana Jaya, Ampang or Sri Petaling LineMasjid JamekThe Sultan Abdul Samad Building opposite Merdeka Square is about a 10-minute walk from the station.
KL TowerKL MonorailBukit NanasThe KL Forest Eco Park entrance near KL Tower is about an 18-minute uphill walk from the station.
Thean Hou TempleNo direct rail accessNot applicableTourism Malaysia recommends a taxi; a ride-hailing car is the comparable road-based option.

Does the Kuala Lumpur MRT Go Directly to KLIA?

No. The airport leg is provided by Express Rail Link, or ERL, not as a through MRT or LRT ride. The simplest route is KLIA Ekspres from KL Sentral.

KLIA Ekspres runs every 20 minutes and takes 28 minutes to KLIA Terminal 1, followed by 3 more minutes to Terminal 2. The adult fare is RM55.00 (≈ USD13.61) for a single ticket or RM100.00 (≈ USD24.75) for a return ticket. The operator publishes current airport times and fares.

KLIA Transit takes 39 minutes from KL Sentral to Terminal 2 and costs RM55.00 (≈ USD13.61) for an adult single ticket. KLIA Ekspres and KLIA Transit tickets are not interchangeable. Travelers continuing to Thailand can plan onward city transfers with the Bangkok metro map.

The Putrajaya Sentral airport route uses the MRT Putrajaya Line to Putrajaya Sentral, followed by a walk of 1 to 2 minutes and a separate KLIA Transit ticket. The airport leg takes 16 minutes to Terminal 1 and another 4 minutes to Terminal 2, at RM9.40 (≈ USD2.33) for an adult. Rapid KL passes such as My50 are not valid at the KLIA Transit gate. USD conversions use Bank Negara Malaysia’s reference rate of USD 1 = RM 4.0401 for August 20, 2026.

Rapid KL MRT and LRT Tickets and Fares

The urban rail network uses distance-based fares. The official fare calculator compares token, Touch ’n Go and concession fares for a selected journey.

A Touch ’n Go card price starts at RM10.00 (≈ USD2.48), with stored value separate; station packages may bundle the card with a minimum stored value. Current pass conditions list rail customer-service counters as sales points, subject to stock and excluding BRT and bus-hub counters.

For international visitors, Rapid Kembara is open to all users and costs RM25.00 (≈ USD6.19) for one day or RM55.00 (≈ USD13.61) for three days, excluding the card and minimum purse value.

My50 costs RM50.00 (≈ USD12.38) for 30 days and is restricted to Malaysian citizens.

TicketPriceBuy ticket
Single journey tokenDistance based; the ticket-vending machine displays the cash fare for the selected trip.Available from station ticket-vending machines or staffed customer-service counters; product details.
Touch ’n Go cardCard prices start at RM10.00 (≈ USD2.48); stored value is separate. Station packages may bundle the card with a minimum stored value.Rail customer-service counters, subject to stock.
Rapid KembaraRM25.00 (≈ USD6.19) for one day or RM55.00 (≈ USD13.61) for three days, excluding the card and minimum stored value.Rail customer-service counters and selected bus hubs; pass details.

Prices as of August 2026; source: Rapid KL.

A single journey token covers one selected same-day trip at the cash fare displayed by the ticket-vending machine.

Debit and credit cards are accepted at all staffed Rapid Rail customer-service counters for token purchases, Touch ’n Go reloads and pass subscriptions. Ticket-vending machines also sell tokens; the counter-payment notice distinguishes this service from the gates.

Rapid Rail’s counter card acceptance does not make direct bank-card tapping a dependable gate option. The Ministry of Transport still described open payment as an implementation project in December 2024, so a token or Touch ’n Go card remains the practical urban-rail choice.

KTM Komuter has different rules. Its gates accept physical MyDebit, Visa and Mastercard cards, supported mobile wallets, KTM media and Touch ’n Go. Riders must use the same payment medium at entry and exit, with the same device for a virtual card.

Rapid KL tokens tap at entry and are inserted at exit. A Touch ’n Go card is the stored-value alternative, while ERL airport services need a separate ticket.

System or connectionRapid KL fare integrationTicket or tap ruleBest use for visitors
Rapid KL MRT, LRT and MonorailA token covers one defined same-day Rapid KL journey; KTM and ERL use separate tickets or payment rules.Tokens tap at entry and are inserted at exit; Touch ’n Go is the stored-value alternative. Bank cards are accepted at staffed counters, not as a dependable direct gate option.Central urban journeys across the MRT, LRT and Monorail network.
KTM KomuterSeparate from Rapid KL fares and the ERL airport ticket.The same accepted medium must be used at entry and exit. Stored-value media require RM5.00 (≈ USD1.24) minimum at entry.Batu Caves and the KTM commuter corridor.
ERL airport servicesNo through MRT ticket at Putrajaya Sentral; the ERL leg needs a separate ticket.KLIA Ekspres and KLIA Transit tickets are not interchangeable.KLIA Terminal 1 and Terminal 2.

Rapid KL MRT and LRT Operating Hours

All six MRT and LRT lines begin at 6:00 AM. Actual last trains vary by line, station and direction.

Frequencies are listed by time band, with separate CBD and non-CBD waits on the Ampang and Sri Petaling lines.

The KL Monorail also opens at 6:00 AM. Weekday peaks run every 7 minutes; other weekday bands use 10 minutes. Saturday waits are 8 to 10 minutes, while Sunday and public-holiday waits are 10 to 12 minutes.

LineMonday-FridaySaturdaySunday and public holidays
Kelana Jaya Line6:00 AM to 7:00 AM and 9:30 AM to 5:00 PM: 7 min; 7:00 AM to 9:30 AM and 5:00 PM to 7:30 PM: 3 min; 7:30 PM to 12:00 AM: 12 min6:00 AM to 10:00 PM: 7 min; 10:00 PM to 12:00 AM: 10 min6:00 AM to 10:00 AM: 10 min; 10:00 AM to 10:00 PM: 7 min; 10:00 PM to 12:00 AM: 10 min
Ampang Line6:00 AM to 7:00 AM, 9:30 AM to 5:00 PM and 7:30 PM to 12:00 AM: CBD 5-10 min, non-CBD 10-20 min; 7:00 AM to 9:30 AM and 5:00 PM to 7:30 PM: CBD 3 min, non-CBD 6 min6:00 AM to 12:00 AM: CBD 5-10 min, non-CBD 10-20 min6:00 AM to 12:00 AM: CBD 5-10 min, non-CBD 10-20 min
Sri Petaling Line6:00 AM to 7:00 AM, 9:30 AM to 5:00 PM and 7:30 PM to 12:00 AM: CBD 5-10 min, non-CBD 10-20 min; 7:00 AM to 9:30 AM and 5:00 PM to 7:30 PM: CBD 3 min, non-CBD 6 min6:00 AM to 12:00 AM: CBD 5-10 min, non-CBD 10-20 min6:00 AM to 12:00 AM: CBD 5-10 min, non-CBD 10-20 min
Kajang Line6:00 AM to 7:00 AM: 8 min; 7:00 AM to 9:30 AM and 5:00 PM to 7:30 PM: 4 min; 9:30 AM to 5:00 PM and 7:30 PM to 12:00 AM: 10 min6:00 AM to 12:00 AM: 10 min6:00 AM to 11:30 PM: 10 min
Putrajaya Line6:00 AM to 7:00 AM, 9:30 AM to 5:00 PM and 7:30 PM to 12:00 AM: 10 min; 7:00 AM to 9:30 AM and 5:00 PM to 7:30 PM: 5 min6:00 AM to 12:00 AM: 10 min6:00 AM to 11:30 PM: 10 min
Shah Alam Line6:00 AM to 7:00 AM, 9:30 AM to 5:00 PM and 7:30 PM to 12:00 AM: 10-15 min; 7:00 AM to 9:30 AM and 5:00 PM to 7:30 PM: 8 min6:00 AM to 12:00 AM: 10 min6:00 AM to 11:30 PM: 10 min

The last-train table lists terminal departures, not intermediate-station times. Full station times are available for Kelana Jaya, Ampang/Sri Petaling, Kajang, Putrajaya and Shah Alam through the official line pages.

Line details: Kelana Jaya, Ampang and Sri Petaling, Kajang, Putrajaya and Shah Alam.

Last KL Monorail departures are 11:30 PM from KL Sentral and 11:55 PM from Titiwangsa. Connections need a one-hour buffer before last-train operation ends, and special events may use dedicated schedules.

Sunday and public-holiday operating bands end earlier on the Kajang, Putrajaya and Shah Alam lines than on regular Monday-to-Saturday service.

LineDayDirection 1Direction 2
Kelana JayaMon-SatGombak to Putra Heights: 11:35 PMPutra Heights to Gombak: 11:20 PM
Kelana JayaSun/PHGombak to Putra Heights: 11:17 PMPutra Heights to Gombak: 10:50 PM
AmpangMon-SunSentul Timur to Ampang: 11:53 PMAmpang to Sentul Timur: 11:30 PM
Sri PetalingMon-SunSentul Timur to Putra Heights: 11:49 PMPutra Heights to Sentul Timur: 11:30 PM
KajangMon-SatKwasa Damansara to Kajang: 11:36 PMKajang to Kwasa Damansara: 11:35 PM
KajangSun/PHKwasa Damansara to Kajang: 11:06 PMKajang to Kwasa Damansara: 11:05 PM
PutrajayaMon-SatKwasa Damansara to Putrajaya Sentral: 11:36 PMPutrajaya Sentral to Kwasa Damansara: 11:34 PM
PutrajayaSun/PHKwasa Damansara to Putrajaya Sentral: 11:00 PMPutrajaya Sentral to Kwasa Damansara: 11:05 PM
Shah AlamMon-SatBandar Utama to Johan Setia: 11:56 PMJohan Setia to Bandar Utama: 11:37 PM
Shah AlamSun/PHBandar Utama to Johan Setia: 11:25 PMJohan Setia to Bandar Utama: 11:05 PM

Rapid KL MRT and LRT Expansion Plans

The Shah Alam Line is already in passenger service. It was inaugurated on June 28, 2026; the official record states that passenger service began at 6:00 AM on June 29, 2026.

The Shah Alam Line links Bandar Utama and Johan Setia over 37.8 km. Prasarana Malaysia Berhad owns the project. The operating scope includes 20 stations, with five additional provisional stations.

Paid service on the Shah Alam Line began on August 15, 2026, and fares also apply to feeder buses and Park N’ Ride. The published end-to-end fares are RM4.90 cash (≈ USD1.21), RM4.30 cashless (≈ USD1.06) and RM2.40 concession (≈ USD0.59). Stored-value cards need a minimum balance of RM5.00 (≈ USD1.24). Touch ’n Go is used at the gates; vending machines issue journey tickets, with QR tickets specific to Shah Alam Line machines.

Bandar Utama connects with the Kajang MRT, while Glenmarie 2 connects with the Kelana Jaya LRT. The project design targets an end-to-end journey of under 60 minutes.

MRT3 is a different project. Its 51 km orbital alignment has final Railway Scheme approval and is designed with ten interchange stations connecting MRT, LRT, KTM and Monorail. The Singapore MRT map covers the neighboring network to the south.

The July 2025 MRT3 Railway Scheme approval allowed land acquisition to begin, and that acquisition is targeted for completion by the end of 2026.

MRT Corp has not announced a passenger-opening year for MRT3; in June 2026 the company was still tendering land-protection works such as demolition, fencing and clearing.

Fun Fact: In its 2022 country brochure, Alstom described Kuala Lumpur’s 374-vehicle Innovia Metro order as its largest such order globally. Final assembly and interior fit-out for Kelana Jaya vehicles took place locally at Westport.

Kuala Lumpur Metro Map FAQ

What is the latest Kuala Lumpur metro map?

The integrated transit plan shows Rapid KL’s MRT, LRT, Shah Alam and Monorail lines together with KTM, ERL and BRT connections.

Where can I download the Kuala Lumpur MRT map as a PDF?

The PDF Download button above the map opens the full one-page Rapid KL integrated transit plan as a PDF at full resolution, ready to zoom, save or print.

How much do MRT and LRT rides cost in Kuala Lumpur?

Rapid KL fares are distance based, and the official fare calculator or station machine displays the price for a selected journey. Rapid Kembara costs RM25.00 (≈ USD6.19) for one day or RM55.00 (≈ USD13.61) for three days, based on the August 20, 2026 BNM reference rate.

Can I pay by contactless bank card on Rapid KL?

Bank cards can pay at staffed Rapid Rail counters for tokens, Touch ’n Go reloads and passes. Direct bank-card tapping is not a dependable Rapid KL gate option, so tokens or Touch ’n Go remain the practical choices.

What time do Kuala Lumpur MRT and LRT trains start and stop?

Regular frequency bands begin at 6:00 AM. Weekday peak waits are three minutes on Kelana Jaya and the central Ampang/Sri Petaling corridor, four minutes on Kajang, five minutes on Putrajaya and eight minutes on Shah Alam. Last departures vary by terminal, day, station and direction, as shown in the tables above.

Does the MRT go directly to KLIA or KLIA2?

No. The separate ERL airport service runs from KL Sentral, or passengers can change from the Putrajaya MRT at Putrajaya Sentral. MRT and ERL require separate tickets on the Putrajaya route.

How do I get to KL Sentral by MRT?

Muzium Negara on the Kajang Line is the MRT station for KL Sentral; a pedestrian link connects the two.

How do I reach Batu Caves by train?

KTM Komuter serves Batu Caves on the Batu Caves to Pulau Sebang corridor. KTM is a separate commuter system, not an MRT or LRT route, and its own payment and schedule rules apply.

Is the Shah Alam Line, or LRT3, open in 2026?

Yes. Passenger service began at 6:00 AM on June 29, 2026, between Bandar Utama and Johan Setia.

Which station is best for Bukit Bintang and the Petronas Towers?

Bukit Bintang on the Kajang Line serves the Bukit Bintang shopping district. KLCC on the Kelana Jaya Line serves Suria KLCC and the Petronas Twin Towers.

More Metro Maps

You might also be interested in these metro maps – for comparison or for your next trip: