Dortmund Metro Map 2026: Stadtbahn, Tickets & Prices
Last updated: July 15, 2026
Last updated: July 15, 2026
Current Service Updates
Track construction on Brackeler Hellweg near In den Börten and Brackel Kirche means that parts of line U43 are replaced by buses on about 41 days from the summer vacation period through September 2026. DSW21 updates the dates and affected sections as work progresses. Check the latest DSW21 service updates before traveling because construction arrangements may change at short notice.
The official Dortmund metro map from DSW21 shows the Stadtbahn alongside connections to the separate Rhine-Ruhr S-Bahn and regional rail services. DSW21 currently provides the Dortmund metro map PDF in German. The downloadable Dortmund Stadtbahn map gives travelers a clear overview of routes, transfer hubs and S-Bahn connections.
The Dortmund Stadtbahn light rail network links Dortmund Central Station, the city center, residential districts and many visitor destinations without a separate subway fare system. Visitors may hear the system called the Dortmund U-Bahn, but Stadtbahn is the precise term: trains mostly use tunnels in the center and often run above ground farther out.
One network has two distinct faces: of the 75 km Dortmund Stadtbahn network, 20.5 km runs in tunnels and 54.5 km above ground. DSW21, formally Dortmunder Stadtwerke AG, operates every route. All eight lines generally run every 10 minutes during the day; on shared city-center tracks, a train arrives about every two minutes.
Inhaltsverzeichnis
The network developed from Dortmund’s streetcar system and was gradually upgraded into today’s Stadtbahn. Three central trunk routes meet at Kampstraße, Reinoldikirche and Stadtgarten. The network reached its current layout in 2008.
The network has 124 stops, including 98 above ground and 26 underground. Of the underground stations, 24 have step-free access. Because stop totals use slightly different definitions, route length provides a more reliable basis for comparison.
About 130 million passengers per year use DSW21 buses and trains combined; this figure does not represent Stadtbahn ridership alone.
The official list has no U48 line. Current timetables for all eight lines are available in the DSW21 downloads section. Temporary replacement services do not change the regular termini.
This Dortmund metro map covers a Stadtbahn light rail system with underground city-center sections and above-ground tracks. The Rhine-Ruhr S-Bahn and TU Dortmund H-Bahn are separate systems.
| System | Operation / technology | Dortmund example | Fare |
|---|---|---|---|
| Stadtbahn | City-center tunnels; some outer sections above ground | U41-U47 and U49 | VRR |
| Streetcar | Stadtbahn origin; some street-running sections remain | Development of today's network | VRR |
| S-Bahn | Regional commuter rail | S1 at Dortmund Central Station and Universität | VRR and Deutschlandticket |
| H-Bahn | Driverless suspended railway on its own guideway | TU Dortmund | Check the current separate H-Bahn fare before traveling |
The Dortmund metro map helps visitors find direct light rail connections from Dortmund Central Station to the city center and many attractions. The airport lies outside the Stadtbahn network. Signal Iduna Park is served by U45 at Westfalenhallen, while U49 runs directly to Westfalenpark. The destinations table matches each attraction with its Stadtbahn line and stop.
| Destination | Line | Stop | Tip |
|---|---|---|---|
| Signal Iduna Park | U45; U42 alternative | Westfalenhallen; Theodor-Fliedner-Heim | Check DSW21 service information for event-day changes |
| Westfalenhallen | U45/U46 | Westfalenhallen | Direct venue access |
| Westfalenpark | U49 | Westfalenpark | Park and stop share a name |
| Rombergpark | U49 | Rombergpark | Park and stop share a name |
| Dortmund Zoo | U49 | Hacheney | Walk or take a bus for the last leg |
| Dortmunder U | Several lines | Dortmund Central Station or Westentor | Short walk |
| Reinoldikirche | U42/U43/U44/U46 | Reinoldikirche | Central transfer point |
A common misconception concerns Borsigplatz, where Borussia Dortmund was founded in 1909. The stadium is several kilometers farther south. For Signal Iduna Park, take U45 toward Westfalenhallen, not U44 to Borsigplatz.
Dortmund Airport is not directly served by the Stadtbahn. The AirportExpress leaves from Dortmund Central Station, while an AirportShuttle connects Holzwickede station with the terminal.
Use the current official airport timetable to check departure times, travel times and special fares.
The airport-connections table compares the three common routes to Dortmund Airport by travel time, fare and ticket rules. The AirportExpress and AirportShuttle use separate fares, so VRR tickets and the Deutschlandticket are not valid on those two services.
| Option | Connection | Travel time | Fare |
|---|---|---|---|
| AirportExpress | Dortmund Central Station to terminal, nonstop | About 25 min | 10.00 EUR (approx. 11.54 USD); ages 6-14: 2.00 EUR (approx. 2.31 USD); under 6: free. Separate fare: VRR and Deutschlandticket not valid |
| Regional train + AirportShuttle | Regional train to Holzwickede; AirportShuttle to terminal | Shuttle about 6 min + train journey | Shuttle 3.00 EUR (approx. 3.46 USD); ages 6-14: 2.00 EUR (approx. 2.31 USD); train uses VRR fare |
| U47 + bus 490 | U47 to Aplerbeck; bus 490 to airport | Timetable-dependent | VRR fare varies by connection |
Stadtbahn and bus services use the VRR fare system. Since June 1, 2026, Dortmund has been a single fare area, so a trip entirely within the city uses fare level A. Trips into neighboring areas generally use B, while journeys across the full VRR region use C. The journey planner shows the correct level for each connection.
A 24-hour ticket becomes valid when it is validated and, according to VRR, pays off from the third trip.
Validate paper tickets as indicated on the ticket or ticket machine. Digital tickets must be valid before you start your trip.
| Ticket | Prices | Buy a ticket |
|---|---|---|
| Adult single ticket, fare level A | 3.80 EUR (approx. 4.38 USD) | Android / iOS |
| Child single ticket, fare level A | 2.10 EUR (approx. 2.42 USD) | Android / iOS |
| Four-ride adult ticket, fare level A | 15.20 EUR (approx. 17.53 USD) | Android / iOS |
| 24-hour ticket, 1 person, fare level A | 7.60 EUR (approx. 8.77 USD) | View ticket |
| 24-hour ticket, 2 people, fare level A | 12.70 EUR (approx. 14.65 USD) | View ticket |
| 24-hour ticket, 3 people, fare level A | 17.80 EUR (approx. 20.53 USD) | View ticket |
| 24-hour ticket, 4 people, fare level A | 22.90 EUR (approx. 26.42 USD) | View ticket |
| 24-hour ticket, 5 people, fare level A | 28.00 EUR (approx. 32.30 USD) | View ticket |
| Deutschlandticket | 63.00 EUR per month (approx. 72.67 USD) | View ticket |
Prices as of January 2026; source: VRR.
The Deutschlandticket is valid throughout Germany on buses, Stadtbahn services, S-Bahn trains and second-class local trains, but generally not on ICE, IC or EC services. A 24-hour ticket is often better for one day in Dortmund; travelers who already have a Deutschlandticket pay no additional Stadtbahn fare.
eezy.nrw is a flexible option that does not require choosing a fare level in advance. Check in through a participating app before boarding and check out after the trip. The fare combines a base price with straight-line distance. In the VRR area, it is capped at the comparable single-ticket price; a 24-hour cap and a 2026 monthly cap of 63.00 EUR (approx. 72.67 USD) also apply.
The Dortmund Stadtbahn timetable varies by line, day and time. During the day, all eight lines generally run every 10 minutes. Shared city-center tracks provide more frequent service. Check the first and last train for your specific line in the DSW21 journey planner.
At night, the NachtExpress bus network takes over. Buses operate on Friday and Saturday nights and on nights before public holidays. Reinoldikirche is the central departure hub, and NE3 has its own stop there. DSW21 runs several NachtExpress routes on these nights; current individual timetables are available in the DSW21 downloads section.
In short, Dortmund has a Stadtbahn with eight lines, U41 through U47 plus U49, in the VRR fare network, plus the separate H-Bahn campus system. Dortmund is gradually making stops step-free. DSW21 provides ongoing project updates. A new feasibility study is being prepared for a possible U47 extension from Huckarde to Kirchlinde, but no route or opening date has been approved.
The H-Bahn, a driverless suspended railway, is Dortmund’s most unusual rail system. Its roughly 3.4 km route links five stations at TU Dortmund: Technologiezentrum, Universität S, Campus Nord, Campus Süd and Eichlinghofen. When it opened on May 2, 1984, it was Germany’s first system of its kind. Extensions to Eichlinghofen in 1993 and Technologiezentrum in 2003 brought it to its current size. During the university term, it carries about 7,000 passengers per day, rising to 8,000 at peak times. DSW21 subsidiary H-BAHN21 operates it.
The H-Bahn is not part of the eight-line Dortmund Stadtbahn network. A connection with the separate S1 service at Universität S nevertheless provides access between the campus, Dortmund Central Station and the wider region. H-BAHN21 plans an extension toward Theodor-Fliedner-Heim with a connection to Stadtbahn line U42. Construction of an approximately 0.8 km test section is planned for 2028, but no binding completion date for the full route is available.
Fun Fact: In just over four decades, the H-Bahn has carried more than 45 million passengers and covered over 5.9 million km, all fully automatically and without drivers.
Technically, no. Dortmund has a Stadtbahn, or light rail network, that runs mostly underground in the city center and partly above ground elsewhere. In everyday travel information, it is often described as the Dortmund metro.
There is no direct Stadtbahn connection. Take the AirportExpress from Dortmund Central Station, or travel by regional train to Holzwickede and continue on the AirportShuttle. Check the current official timetable before departure.
An adult single ticket for fare level A costs 3.80 EUR (approx. 4.38 USD) in 2026. A 24-hour ticket for one person costs 7.60 EUR (approx. 8.77 USD).
The last departure varies by line and day. DSW21 lists reliable departure times in its journey planner. On weekends and before public holidays, the NachtExpress supplements regular service.
U45 runs to Westfalenhallen. Alternatively, take U42 to Theodor-Fliedner-Heim. Check for special traffic arrangements on match days.
Many Signal Iduna Park admission tickets also cover a round trip on public transport on match day. They cover second-class travel across the VRR, WestfalenTarif, VRS and AVV areas, effectively all of North Rhine-Westphalia, until 3 a.m. the following day. The transit entitlement is printed on season tickets. If you bought a day ticket online, you must retrieve a separate public transport ticket for technical reasons. Check the wording on your ticket, as public transport is not included with every admission ticket.
No. The H-Bahn is a separate driverless suspended railway on the TU Dortmund campus.
Many stops offer step-free access via elevators and raised platforms, although facilities vary by stop. DSW21 provides accessibility information and reports elevator outages in its service updates. Travelers using a wheelchair or stroller should check the latest elevator status before departure.
DSW21 posts construction work, replacement services and short-notice changes on its service updates page and in the DSW21 app.




(No Ratings Yet)
Loading...