Mumbai Metro Map 2026: Lines, Tickets & Prices
Last updated: 23 July 2026
Last updated: 23 July 2026
Current Mumbai Metro service updates
At CSMI-Airport-T2, Gate B1 has been closed until further notice since 11 April 2026. Gates A1 and A2 remain open, and A1 connects to Terminal Parking Level 6 by footbridge. Check the airport access notice before travelling.
The Mumbai Metro Map brings several separately operated lines into one visitor guide. Mumbai Metro One Private Limited runs Line 1, Maha Mumbai Metro Operation Corporation Limited runs Lines 2A, 7 and the open phases of 2B and 9, while Mumbai Metro Rail Corporation Limited runs Line 3. Mumbai Suburban Railway, Mumbai Monorail and Navi Mumbai Metro are separate systems.
Mumbai’s 33.5 km Aqua Line is the city’s first and only fully underground metro line, and its completion changed how visitors can cross central and southern Mumbai. The operational network also includes elevated corridors, but it does not have one operator or one fare structure.
As of 23 July 2026, passenger service covers Lines 1, 2A, 3 and 7 plus only Phase 1 of Lines 2B and 9.
The Mumbai Metropolitan Region Development Authority, known as MMRDA, develops and oversees metro projects. It is not the operator of every line. Any Mumbai Metro route map therefore needs a date and operator label to prevent planned corridors from looking open.
The operational-status table is current to 23 July 2026. No combined network length, station total or ridership figure is stated because official sources use different dates and scopes, while Lines 7 and 9 operate as an integrated corridor.
The Aqua Line has operated end to end from Aarey JVLR to Cuffe Parade since 8 October 2025. Its 27 stations include 26 underground stations and one above-ground station, giving visitors a direct rail corridor through the airport area, BKC and South Mumbai.
Line 3 opened in three stages. Aarey JVLR to BKC entered passenger service on 7 October 2024. BKC to Acharya Atre Chowk followed on 10 May 2025, before the final section to Cuffe Parade completed the corridor.
The latest official MMRC image shows all 27 stations, including the two airport stations. It is a Line 3 diagram, not a network-wide map for lines operated by MMOPL and MMMOCL.
The embedded diagram is the official Maha Mumbai Metro Network Diagram. It shows Lines 1 to 14, the Monorail, Navi Mumbai Metro and Suburban Railway, together with an operational-status table. Because that table reflects a 2025 snapshot, it still lists the Line 2B and Line 9 Phase 1 sections and the full Line 3 corridor differently from their current status, so mixed open, under-construction and planned corridors appear on one image. In particular, it shows the complete planned alignments of Lines 2B and 9 even though only Phase 1 of each line carries passengers as of 23 July 2026.
Use the dated operational table rather than line colours alone when planning a trip. Each row distinguishes a passenger-open section from the longer planned corridor. This is especially important for Lines 2B and 9, whose complete alignments extend beyond the Phase 1 sections currently available to passengers.
Mumbai Suburban Railway is a separate Indian Railways network operated by Western Railway and Central Railway. Its services are not metro lines, even when a journey combines a Local train and metro connection.
Mumbai Monorail is another separate system. Its 20 km route with 17 stations has had passenger operations suspended until further notice since 20 September 2025, so it is not a current metro alternative.
Navi Mumbai Metro is a separate CIDCO system, with Line 1 operation and maintenance handled by Maha Metro. Its 11.1 km Belapur to Pendhar Line 1 has run since 17 November 2023, but it does not directly serve Navi Mumbai International Airport.
| Line | Color | Open section | Operator | Opened/status date | Selected stations and connections | Fare/ticket scope | Official source |
|---|---|---|---|---|---|---|---|
| Line 1 | Blue | Versova to Ghatkopar | MMOPL | Open since 8 June 2014 | Versova, Ghatkopar | Separate Line 1 products and fare calculator | Line 1 details |
| Line 2A | Yellow | Andheri West to Dahisar East | MMMOCL | Fully open since 19 January 2023 | Andheri West, Dahisar East | ₹10 to ₹80, approximately $0.10 to $0.83, for Lines 2A and 7 products | Line 2A details |
| Line 7 and Line 9 Phase 1 | Red | Gundavali to Kashigaon | MMMOCL | Integrated service since 8 April 2026 | Gundavali, Dahisar East, Kashigaon | Check the current Line 9 fare separately before making a journey | April 2026 status notice |
| Line 2B Phase 1 | Yellow | Mandale to Diamond Garden | MMMOCL | Open since 8 April 2026 | Mandale, Mankhurd, Diamond Garden | MMMOCL ticket scope | April 2026 status notice |
| Line 3 | Aqua | Aarey JVLR to Cuffe Parade | MMRC | Complete corridor open since 8 October 2025 | Aarey JVLR, CSMIA Airport-T1, CSMI-Airport-T2, Cuffe Parade | ₹10 to ₹70, approximately $0.10 to $0.73, for Line 3 products | Completion details |
| System | Best for | Mumbai visitor example | Important limitation |
|---|---|---|---|
| Mumbai Metro | Trips served by the operational metro corridors | Line 3 to CSMIA T1, CSMIA T2, BKC, CSMT or Churchgate | Fares, apps and timetables differ by operator |
| Mumbai Suburban Railway | Trips on Western Railway and Central Railway suburban services | Combine a Local train with the metro where the destination requires both | It is a separate rail system and is not included in metro totals |
| Mumbai Monorail | No current passenger journey | Do not plan a 2026 visitor trip around the service | Passenger operations have been suspended until further notice since 20 September 2025 |
| Navi Mumbai Metro | Belapur to Pendhar trips in Navi Mumbai | Use the separate Line 1 within Navi Mumbai | It is a separate CIDCO system and does not directly serve Navi Mumbai International Airport |
Visitors should choose the rail system by destination rather than force every journey onto the metro. Line 3 now provides the strongest direct coverage of the airport, BKC and several central or southern landmarks, while other places still need a road connection or a separate Local train.
The Mumbai Metro Destinations table follows MMRC’s official destination data. Walking estimates are approximate and should be treated as practical orientation, especially in heat, heavy rain or when travelling with luggage.
Line 3 serves both terminals of Chhatrapati Shivaji Maharaj International Airport, or CSMIA. Terminal 1 uses CSMI-Airport-T1 station, where Gate A1 is open and the official walking estimate is approximately three minutes.
Terminal 2 uses CSMI-Airport-T2 station. Gate A1 connects by footbridge to Terminal Parking Level 6, while Gate A2 is near Sahar Police Station. Gate B1 has been closed until further notice since 11 April 2026.
MMRC’s nearby-places data also estimates approximately three minutes on foot between the T2 station access and the terminal. It does not provide a usable airport-to-centre train time, so this guide does not publish a zero-minute or invented city journey.
Use the two named Line 3 stations for terminal access.

The Gateway of India and Mumbai waterfront, reached from the wider visitor transport network.
| Destination | Line | Station | Note |
|---|---|---|---|
| Gateway of India and Colaba | Line 3 | Hutatma Chowk | Gateway of India is about 1.5 km or 18 minutes on foot. A bus or taxi can be more practical in heat or with luggage. |
| Bandra-Kurla Complex | Line 3 | Bandra-Kurla Complex | The National Stock Exchange is about 7 minutes away. Jio World Drive is about 13 minutes on foot or 5 minutes by public transport. |
| Marine Drive | Line 3 | Churchgate Metro | The Air India side viewpoint is about 450 metres or 5 minutes away. Check which part of the long promenade is the actual destination. |
| Shree Siddhivinayak Ganpati Mandir | Line 3 | Siddhivinayak | The temple is about 1 minute from the station. |
| Juhu Beach | Line 3 plus road connection | Santacruz Metro | The beach is about 60 minutes on foot or 25 minutes by public transport. Use an auto-rickshaw or taxi for the final section. |
| Chhatrapati Shivaji Maharaj Terminus | Line 3 | CSMT Metro | The terminus is about 40 metres away. Gate A2 is identified for CSMT. |
| Shree Mahalakshmi Temple | No practical door-to-door metro connection | Jagannath Shankar Sheth Metro | The temple is about 2.6 km or 31 minutes on foot. Do not confuse the temple with a station of a similar name. |
| High Street Phoenix | Line 3 | Science Centre | The destination is about 0.9 km or 11 minutes on foot via the B2 or B3 side. |
There is no single fare table for every line. MMOPL manages Line 1 products, MMMOCL publishes fares and passes for Lines 2A and 7, and MMRC sets Line 3 fares.
All amounts below are current to 23 July 2026. Approximate dollar values use the Federal Reserve reference rate from 17 July 2026 of ₹96.28 per $1.
Line 1 offers paper QR, Mobile QR, Smart Card, NCMC and Trip Pass products. Its 45-trip and unlimited Trip Passes are valid for 30 days on one fixed origin and destination combination. An up-to-date static fare ladder was not available from the official calculator.
| Ticket | Price | Buy ticket |
|---|---|---|
| MMOPL Line 1 single or return ticket | Use the current origin and destination fare calculator | Buy Mobile QR through Paytm, PhonePe or WhatsApp +91 9670008889 |
| MMMOCL Lines 2A and 7 distance fare | ₹10 to ₹80, approximately $0.10 to $0.83 | Android or iOS |
| MMRC Line 3 distance fare | ₹10 to ₹70, approximately $0.10 to $0.73 | Android or iOS |
MMMOCL also offers a Store Value Pass with a 5 percent discount from Monday to Saturday and 10 percent on Sundays and national holidays. Its Tourist Pass costs ₹80, approximately $0.83, for one day or ₹200, approximately $2.08, for three days. Mumbai One, WhatsApp, Mumbai One Card and NCMC are available channels, with Uber and ONDC added for QR tickets.
Mumbai One is the current shared app name. The service covers multiple transport operators and supports return journeys for Line 1 and Line 3, while its iOS history also names Lines 2A and 7.
For Line 3, MetroConnect3 is the official MMRC app. Line 3 also offers a Tourist Trip Pass for ₹280, approximately $2.91, for one day or ₹700, approximately $7.27, for three days. Line 3 accepts NCMC, paper QR and mobile QR, but this guide does not claim cross-line NCMC compatibility because that specific 2026 scope was not directly verified.
Operating hours and frequencies vary by operator, line and direction. None of the regular published schedules establishes 24-hour service, and festival extensions should not be mistaken for the normal timetable.
Line 1 follows a demand-adjusted timetable on Saturdays, Sundays and public holidays without a fixed current frequency on the operator page. The 2026 MMMOCL schedule lists different trip totals for weekdays, Saturdays and Sundays on Line 2A and Lines 7/9.
Construction progress, a trial run, regulatory preparation and passenger service are different milestones. Only the first phases of Lines 2B and 9 entered regular service on 8 April 2026, while their remaining corridors were still in development.
A project-status annex to a Lok Sabha reply recorded the complete planned Line 2B corridor at 23.6 km and 92 percent civil progress on 28 February 2026. Only Mandale to Diamond Garden is in the operational status.
The combined Line 9 and 7A project stood at 75.3 percent civil progress on 28 February 2026. Passenger service covers only Line 9 Phase 1 to Kashigaon. Line 7A was not open and must not be presented as an airport connection.
Lines 4, 4A, 5 Phase 1 and 6 stood at 90.5, 96.5, 97.6 and 86.9 percent civil progress respectively on 28 February 2026. A Line 4A trial run took place on 22 September 2025, but no passenger opening was verified.
No unverified opening year is assigned to these projects, and planned sections are kept outside the operational line list.
Fun Fact: Mumbai’s Aqua Line was bored with 17 tunnel-boring machines, and MMRC recorded its 42nd and final breakthrough in November 2022 after completing 55 km of twin tunnels. This included 484 metres below the active Mithi River channel. The 55 km figure describes cumulative twin-tunnel construction, not passenger route length.
Yes. As of 23 July 2026, passenger service covers Lines 1, 2A, 3 and 7 plus only Phase 1 of Lines 2B and 9. MMOPL operates Line 1, MMMOCL operates Line 2A, Line 7 and the open phases of Lines 2B and 9, while MMRC operates Line 3. This guide does not publish a self-added station total because official sources use different dates and scopes.
Line 1 starts at 05:30 from Versova and Ghatkopar. Line 2A and the integrated Line 7/9 corridor start at 05:50, while MMRC lists 05:55 from Aarey JVLR on Line 3. Published last departures vary from 22:30 to 23:50 by line and direction.
Mumbai One provides shared mobile ticket functions and official Android and iOS apps. MMRC also offers MetroConnect3 for Line 3, while Line 1 sells Mobile QR tickets through Paytm, PhonePe and WhatsApp.
Use Line 3 at CSMI-Airport-T1 for Terminal 1 or CSMI-Airport-T2 for Terminal 2. Each terminal connection has an official walking estimate of approximately three minutes, but MMRC did not provide a usable airport-to-centre train time in the verified source.
The Aqua Line is the complete 33.5 km Line 3 from Aarey JVLR to Cuffe Parade, with 27 stations. No passenger opening date was verified for Lines 4, 4A, 5 Phase 1 or 6. Construction progress and trial runs are not passenger service.
Use the dated operational tables on this page before choosing a line. For destinations outside practical metro walking range, combine the metro with a Local train, bus, auto-rickshaw or taxi instead of assuming every master-plan corridor is open.
Explore more Asian networks with the Dubai Metro map, Istanbul Metro map and Tokyo subway map, or browse the overview of all metro maps.




(No Ratings Yet)
Loading...